OT / ICS · MANUFACTURING NETWORKS

OT Site Security Assessment

Understand what's on the plant network and how it communicates. Bring passive traffic observations, drawings, site records, and a walkthrough together into an asset inventory and a practical list of security findings.

Request scope and pricing

Defined site scope. Fixed price agreed up front. Work directly with Chris Hyatt.

START WITH WHAT'S THERE

The diagram only helps if it matches the plant.

A device can keep running for years after the person who installed it leaves. Network changes, vendor connections, and undocumented equipment make the plant harder to understand and harder to protect.

An OT security assessment gives operations and IT a shared picture of the environment. It suits manufacturers with incomplete inventories, uncertain IT/OT boundaries, or questions about how equipment and remote support connect.

WHAT GETS EXAMINED

Build the picture from several sources.

Number of sites, network access, capture points, observation time, and site access determine what the assessment can establish.

Observed devices and traffic

Use passive capture with Argus Scout to identify observed devices and communication patterns. Compare those observations with the inventory and records available at the site.

Network zones and boundaries

Review the agreed plant network areas, IT/OT boundaries, and communication paths. Bring drawings, traffic observations, and site knowledge together to identify gaps.

Site and vendor access

Review agreed remote access arrangements and supporting records with the people responsible for the plant. Capture questions that need an owner or further evidence.

WHAT YOU RECEIVE

A picture operations and IT can use.

An asset inventory

A documented view of identified assets, with the available evidence and unresolved identification questions recorded for follow-up.

A network zone diagram

A view of zones and communication paths supported by the assessment evidence, with gaps in visibility made clear.

Prioritized findings

A practical list of security concerns, recommended actions, and what the assessment could not confirm. Review priorities and ownership with your team.

WHAT PASSIVE CAPTURE CAN TELL YOU

Quiet equipment can still be there.

Passive capture records traffic visible at the agreed observation points during the capture window. Equipment that stays quiet, traffic outside those points, and disconnected devices may be absent from the capture.

That is why the review also uses drawings, records, and a walkthrough. The report identifies visibility limits so your team can distinguish an observed fact from something that still needs checking.

HOW THE ENGAGEMENT WORKS

Plan the work around the plant.

01

Define.

Agree on site boundaries, capture arrangements, observation time, access, deliverables, and fees with IT and operations.

02

Examine.

Collect passive observations and review records, drawings, and the site. Record where evidence is missing or contradictory.

03

Improve.

Walk through findings with your team and prioritize actions that fit operating requirements and plant constraints.

04

Verify.

Agree which changes need a follow-up check and how that check will fit the site's access and operating schedule.

BEFORE YOU START

A few practical questions.

Will equipment be actively scanned?

The discovery approach described here uses passive observation. Capture arrangements and site work are agreed with IT and operations before work starts. Any additional testing requires a separately agreed scope.

What determines the price?

The number of sites, network scope, capture window, access arrangements, and deliverables. A fixed price is agreed in writing before work starts.

Can our team use Scout directly?

Explore Argus Scout and product pricing if your team can perform its own discovery and review. Consulting brings the observations together with site context and helps prioritize what to do next.

Where does the plant picture stop being clear?

Describe the site, the missing information, and the operating constraints. Start with the question your team needs answered.

Talk to Chris